Update dependency @types/node to v20.11.25 #181

Merged
Vylpes merged 1 commit from renovate/node-20.x-lockfile into develop 2024-03-11 19:48:04 +00:00
Member

This PR contains the following updates:

Package Type Update Change
@types/node (source) devDependencies patch 20.11.24 -> 20.11.25

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [@types/node](https://github.com/DefinitelyTyped/DefinitelyTyped/tree/master/types/node) ([source](https://github.com/DefinitelyTyped/DefinitelyTyped)) | devDependencies | patch | [`20.11.24` -> `20.11.25`](https://renovatebot.com/diffs/npm/@types%2fnode/20.11.24/20.11.25) | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4wLjAiLCJ1cGRhdGVkSW5WZXIiOiIzNy4wLjAiLCJ0YXJnZXRCcmFuY2giOiJkZXZlbG9wIn0=-->
RenovateBot added the
type
dependencies
label 2024-03-11 00:02:46 +00:00
RenovateBot added 1 commit 2024-03-11 00:02:46 +00:00
Update dependency @types/node to v20.11.25
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
ci/woodpecker/pr/woodpecker Pipeline was successful
ci/woodpecker/pull_request_closed/woodpecker Pipeline was successful
8e48db64c5
Vylpes approved these changes 2024-03-11 19:47:59 +00:00
Vylpes merged commit 2d2c76a266 into develop 2024-03-11 19:48:04 +00:00
Vylpes deleted branch renovate/node-20.x-lockfile 2024-03-11 19:48:04 +00:00
Sign in to join this conversation.
No description provided.